Egress Windows
Some of our offices provide “Turnkey Egress” Window installation. We take pride in providing an efficient total egress solution for our customer. We strictly follow all code requirements and takes extra steps to ensure the best long-term results, including:
- We chainsaw all corners to prevent overcuts.
- We attach a vertical drain to the existing perimeter drain system. If there is not a perimeter system we recommend installation of a sump pump.
- We stand behind all of our work and our window installers work.
- Instead of backfilling with the clay filled excavated soil, we backfill with 3-4 tons of gravel and finish with topsoil. This extra step provides the best drainage possible.
Most Egress Installations Take 2 Days To Complete
| Day 1 |
Day 2 |
- Excavation
- Dirt removal
- Foundation Wall Sawing
- Removal
|
- Adapting the drainage systems
- Window & well installation
- Backfilling
|
Building Code

Download and read the "2000 International Building Code Section R310 - Emergency Escape and Rescue Openings" PDF file.